Premium
This is an archive article published on April 10, 1999

Mega block between CST and Kurla

MUMBAI, April 9: The Central Railway will operate a megablock on the slow track between Chhatrapati Shivaji Terminus and Kurla railway st...

.

MUMBAI, April 9: The Central Railway will operate a megablock on the slow track between Chhatrapati Shivaji Terminus and Kurla railway stations between 10 am-4 pm on Sunday to carry out repair works on tracks and technical equipments.

Hence all slow trains towards Kurla will be run on the fast track along the main line. Passengers with tickets or passengers on harbour line will be permitted to travel along the main line between 9 am -4 pm. A block on the harbour line between Wadala Road and Masjid station between 12.15 am- 5.15 am will lead to the suspension of rail traffic.

 

Latest Comment
Post Comment
Read Comments
Advertisement
Loading Taboola...
Advertisement
Advertisement
Advertisement