Journalism of Courage
Advertisement
Premium

Chandrayaan-2 mission called off for today, technical snag observed: ISRO

The glitch was found in the launch vehicle GSLV MKIII which is the strongest of orbit built by ISRO, and not in Chandrayaan-2 composite module.

chandrayaan 2, chandrayaan 2 launch date, chandrayaan 2 launch date and time, chandrayaan 2 launch time, chandrayaan 2 launch date in india, chandrayaan 2 launch date and time in india, chandrayaan 2 mission, chandrayaan 2 mission launch date, chandrayaan 2 mission launch time, chandrayaan 2 mission launch date and time, chandrayaan 1, Chandrayaan-2, Chandrayaan-2 lander vikram, nasa, isro, Indian Space Research Organisation, ISRO Shukrayaan mission around Venus, ISRO Aditya mission around the sun, indian express, indian express news, indian express sunday eye, chandrayaan 2 mission launch date, chandrayaan 2 mission launch date and time, chandrayaan 2 mission, moon mission Chandrayaan-2: The technical snag was observed in the vehicle system at T-56 minutes. (Source: ISRO)

In an anti-climax to the build-up around the historic moment, a keenly awaited launch of Chandrayaan-2 had to be aborted about an hour before the scheduled launch time due to a technical snag in the launch vehicle system.

The Indian Space Research Organisation (ISRO) said the technical snag was observed 56 minutes before the scheduled time, sourcing it to stop the countdown and then put the launch off for “today”.

“A new launch date will be announced later,” ISRO added. It was not clear, how soon the new launch date could be.

ISRO officials indicated that it could take up to a few days to asses how serious the glitch was, that could rule out another attempt at the launch in the current window of opportunity that was available only till July 16.

The glitch was found in the launch vehicle GSLV MKIII which is the strongest of orbit built by ISRO, and not in Chandrayaan-2 composite module. Before the countdown was stopped, ISRO’s last update about the mission said that it had completed fueling of liquid hydrogen into the rocket.

Read | Chandrayaan-2: Cheat sheet to all the space jargon you may encounter

Chandrayaan-2 was supposed to be ISRO’s first attempt to make a soft landing on the surface of the moon. Today’s mission was to follow the successful maiden Lunar Mission Chandrayaan-1 launched in 2008. The rocket (Chandrayaan-1) which made more than 3,400 orbits around the moon, was operational for 312 days till August 29,2009.

Story continues below this ad
Spectators leave after the Chandrayaan-2 mission was aborted at Sriharikota, in southern India, Monday, July 15, 2019. (AP)

After a full dress rehearsal last week, the countdown for the mission commenced at 6.51 am on Sunday and scientists underwent various stages of propellant filling to power the rocket ahead of the launch.

Curated For You

 

Tags:
  • Chandrayaan-2 ISRO
Edition
Install the Express App for
a better experience
Featured
Trending Topics
News
Multimedia
Follow Us
Express PremiumTrial by fire: Why RBI Governor Sanjay Malhotra’s 1st year in office was just a warm up
X