Premium
This is an archive article published on January 12, 2017

NTPC inks pact to take over Chhabra Thermal Power Plant

NTPC Ltd has signed a non-binding MoU with Rajasthan Rajya Vidyut Utpadan Nigam Ltd and Rajasthan Urja Vikas Nigam Ltd for takeover of Chhabra Thermal Power Plant

State-run NTPC has signed a non-binding agreement with Rajasthan Rajya Vidyut Utpadan Nigam Ltd and Rajasthan Urja Vikas Nigam Ltd for takeover of Chhabra Thermal Power Plant.

“NTPC Ltd has signed a non-binding MoU with Rajasthan Rajya Vidyut Utpadan Nigam Ltd and Rajasthan Urja Vikas Nigam Ltd for takeover of Chhabra Thermal Power Plant Stage-I (4x 250 MW) and Stage-II (2×660 MW) of Rajasthan Urja Vikas Nigam by NTPC Ltd,” the company said in a BSE filing.

WATCH VIDEO | MoU Signed To Transfer Chhabra Thermal Plant To NTPC

Story continues below this ad

The Memorandum of Understanding (MoU) is to takeover four operational units of 250 MW capacity each and two other under-construction units of 660 MW capacity each at Chhabara Thermal Power Plant.

In February last year, a proposal to divest equity of four units of thermal power plants in Rajasthan was cleared at a Cabinet meeting chaired by Rajasthan Chief Minister Vasundhara Raje. Shares of NTPC were trading 2.89 per cent higher at Rs 169.15 apeice on BSE.

Latest Comment
Post Comment
Read Comments
Advertisement
Advertisement
Advertisement
Advertisement