January 02, 2026 7:18 am
This mission will use an unpressurised crew module to demonstrate the complete mission — the human-rated launch vehicle will put the spacecraft in a low earth orbit, ensure re-entry of the crew module, a smooth splashdown and recovery of the module.
December 20, 2025 11:51 pm
During two exercises conducted on December 18 and 19, the space agency tested the ability of the drogue parachutes to work in extreme conditions. The test saw successful “reefed opening” of the parachutes, according to the agency.
December 14, 2025 7:07 pm
One more uncrewed mission is planned later next year before ISRO sends Indian astronauts into low earth orbit in 2027.
December 05, 2025 3:50 am
Two other earth observation satellites are planned to be launched, on separate missions. One of these missions will carry 18 other co-passenger satellites from India as well as overseas.
November 20, 2025 2:10 pm
The 10-second-long test was conducted at Isro's Propulsion Complex at Mahendragiri, Tamil Nadu, on November 7.
November 12, 2025 5:44 am
ISRO conducts ‘integrated main parachute airdrop test’ for the Gaganyaan mission at Babina Field Firing Range in Jhansi, Uttar Pradesh.
October 14, 2025 10:14 am
ISRO's humanoid robot Vyommitra will fly with the Gaganyaan mission to test systems and pave the way for India's first human space mission.
September 19, 2025 2:25 pm
These experiments are a part of India’s preparations to send humans to space
September 10, 2025 4:57 am
These experiments are being conducted in a static mock-up simulator, a model of the spacecraft, in Bangalore
August 25, 2025 5:14 am
ISRO successfully simulates splashdown with full parachute deployment and recovery, marking a key milestone ahead of India’s first crewed spaceflight.
January 02, 2020 7:31 pm
ISRO is working on both the Chandrayaan-3 and Gaganyaan in 2020. However, the launch of Chandrayaan-3 might be pushed back to 2021.



