Historic day for Mizoram: Bairabi-Sairang railway line opens today – Top 10 facts about this engineering marvel

Bairabi-Sairang Railway Line Latest Update: This rail link project will boost Mizoram’s Gross State Domestic Product (GSDP) while providing the cheaper mode of transport.

This railway project falls under the administrative control of the North East Frontier Railway (NFR) zone.This railway project falls under the administrative control of the North East Frontier Railway (NFR) zone.

Bairabi-Sairang Railway Line Inauguration: Prime Minister Narendra Modi will inaugurate the much-awaited Bairabi–Sairang railway line today, marking the first-ever direct rail connectivity to Mizoram’s capital, Aizawl. This achievement will significantly enhance passenger and freight movement, boost socio-economic growth and fulfill a long-standing aspiration of the people of Mizoram.

Bairabi-Sairang Rail Project: Full List of Stations 

The Bairabi-Sairang railway line project features four stations: Hortoki, Kawnpui, Mualkhang, and Sairang-Sihhmui. This rail link project will boost Mizoram’s Gross State Domestic Product (GSDP) while providing the cheaper mode of transport. This railway project falls under the administrative control of the North East Frontier Railway (NFR) zone.

Bairabi-Sairang Rail Line Project: Top 10 Facts to Know About This Infra Marvel

  • The Bairabi–Sairang New Line Project spans 51.38 km and built with an estimated cost of approximately Rs 8,071 crore.
  • The Project phases 4 sections feature 48 tunnels (12.8 km total length), 55 major bridges, 87 minor bridges, 5 ROBs and 6 RUBs.
  • Iconic Bridge No. 196, standing at 114 metres, this bridge is taller than Qutub Minar by 42 metres, showcasing world-class engineering.
  • Railway tunnels are adorned with murals reflecting Mizo heritage, turning travel into a cultural experience.
  • Enhanced rail connectivity will reduce transportation costs, boost trade and stimulate commercial growth in Mizoram.
  • Improved accessibility will promote tourism, leveraging Mizoram’s natural beauty and cultural richness.
  • The project will create jobs, business opportunities near stations and support small-scale industries.
  • Strengthen Rail connectivity across the North-East, improving mobility, logistics and regional integration with the rest of India.
  • Mizoram becomes the fourth Northeastern state whose capital, Aizawl, is directly connected to the railway network.
  • The first-ever trial run to Sairang was conducted on 1st May 2025, marking a historic milestone in connecting Aizawl to India’s railway network.

Anish Mondal is a business journalist with over nine years of experience. He writes on diverse subjects such as Infrastructure, Railways, Roadways, Aviation, Politics, Market, Parliamentary affairs, Corporate earnings, General and International news etc. ... Read More

Stay updated with the latest - Click here to follow us on Instagram

Latest Comment
Post Comment
Read Comments
Advertisement

You May Like

Advertisement