The fire safety audit report, accessed by Chandigarh Newsline, has pointed out that the Kairon block of PGIMER in Sector 12 too has deficiencies in its firefighting system.

New Haryana Secretariat in Sector 17 of Chandigarh As per the report, the New Haryana Secretariat building that houses the offices of all the principal secretaries of Hayana is at risk. Express Archives

AN INSPECTION by the UT fire department as part of the fire safety audit has found serious shortcomings in the firefighting system of top government offices which see hundreds of visitors daily.

The fire safety audit report, accessed by Chandigarh Newsline, has pointed out that the Kairon block of PGIMER in Sector 12 too has deficiencies in its firefighting system.

As per the report, the New Haryana Secretariat building that houses the offices of all the principal secretaries of Hayana, building of Principal Accountant General Punjab and UT, office of Customs, Excise and Income Tax in Sector 17 all are at risk.

[related-post]

Story continues below this ad

In the New Haryana Secretariat building, the yard hydrants were found leaking, that too without hose. Nozzle and internal hydrants accessories were found missing. Not just this, even the automatic detection system and public address (PA) system was not working. The fireman lift was too without a fireman switch. Apart from loose electrical wiring, the main pumps were out of order. The sprinkler system was not even properly installed.

In the office of Principal Accounts General (Audit) Punjab and UT in Sector 17, the basic hose pipes and hose reel nozzle were found missing. The jockey pump too was not in a working order and was leaking, as per the report. No provision of illuminated exit signs, loose electrical wiring, and yard hydrants without accessories were other deficiencies in the system. The building of Principal Accountant General (A and E) Punjab and UT too had similar shortcomings. Here, apart from loose electrical wiring found by the inspection team, yard hydrants were found without accessories. Modular pressure was found less.

The inspection team found irregularities in the firefighting system of the Central Revenue Building and Customs Excise and Income Tax department in Sector 17 as well. The automatic detection/alarm system was not working, no proper exit signs were there. Wet riser and down corner system was without accessories. The fireman lift was without fireman switch and PA system was out of order.

The condition of the firefighting system at Kairon administrative block in PGI was deplorable. The team said that there was not even a fire control room and no provision of fire lift was made.

Story continues below this ad

The mechanical ventilation with detection system has not been provided in the accounts branch here. There is no underground static water storage tank, no hose reels and no illuminated emergency exit signboards have been provided. All these are mandatory requirements as per the national building code.

Hina Rohtaki is a Special Correspondent with The Indian Express, Chandigarh. She covers Chandigarh administration and other cross beats. In this field for over a decade now, she has also received the prestigious Ramnath Goenka Excellence in Journalism Award by the President of India in January 2020. She tweets @HinaRohtaki ... Read More

Stay updated with the latest - Click here to follow us on Instagram

Latest Comment
Post Comment
Read Comments
Advertisement

You May Like

Advertisement