Journalism of Courage
Advertisement
Premium

Work to resume on Pragati Maidan underpass in Delhi after Centre’s nod

Work to resume on Pragati Maidan underpass in Delhi after Centre's nod

Pragati Maidan tunnel, potential threat to public, Public Works Department, pragati maidan tunnel repair work, Pragati Maidan water leakage, tunnel drainage issues, indian express newsThe multi-crore Pragati Maidan tunnel project was inaugurated in 2022. (Express File Photo)

Commuters travelling on the Ring Road stretch near Bhairon Marg, Sarai Kale Khan, and ITO will have a smooth ride by the end of this year, as the Delhi Government has received the go-ahead from the Centre to complete construction of Underpass No 5, officials said Monday.

Construction work at the underpass, which is a part of the Pragati Maidan transit corridor, stopped in 2023 after the precast concrete boxes, pushed beneath an active railway line using the box-pushing method, sank due to flooding caused by the Yamuna River flowing nearby. The Public Works Department (PWD) then proposed a new plan, and sent it to the Union Ministry of Housing and Urban Affairs (MoHUA) seeking approval.

“This is not just a clearance. It is a green signal to speed, transparency, and accountability. Every rupee spent on infrastructure must yield public value, and I am glad that this solution safeguards both engineering integrity and financial responsibility. I thank MoHUA for their support. Now, execution is our top priority, and delay is not an option,” Delhi PWD Minister Parvesh Sahib Singh said.

According to officials, PWD will take steps like carrying out immediate grouting under the box structures to stabilise the soil and prevent further settlement. The other steps it will follow are urgent stitching of boxes beneath the railway embankment, enabling track strengthening and ensuring structural safety.

“The adoption of the cast-in-situ construction method with revised width and height parameters, identified as the most technically viable solution in the current scenario,” said an official.

Underpass 5 is a vital component of Delhi’s strategic transit upgrade, aimed at easing congestion in and around Pragati Maidan, ITO, and nearby arterial roads. Once operational, it will ensure seamless vehicular movement, especially during major conventions and public events at the India Trade Promotion Organisation (ITPO) complex.

PWD has been directed to immediately initiate the approved works and submit weekly progress reports to Singh’s office. The project is now being positioned as a model of high-impact infrastructure delivered with fiscal discipline and administrative resolve.

Stay updated with the latest - Click here to follow us on Instagram

Tags:
  • Pragati Maidan
Edition
Install the Express App for
a better experience
Featured
Trending Topics
News
Multimedia
Follow Us
ExplainSpeakingHas Bihar’s growth reduced the gap with the rest of India?
X