Journalism of Courage
Advertisement
Premium

Delhi Metro completes 865-metre tunnel on Tughlakabad-Aerocity corridor

Delhi Lieutenant Governor Vinai Kumar Saxena and Delhi Transport Minister Kailash Gahlot were present at the site of the breakthrough of the 97-metre-long tunnel boring (TBM) machine, used for tunnelling work. 

delhi metro, Delhi Metro network, Delhi Metro Rail Corporation DMRC, delhi metro stations, Tughlakabad-Aerocity corridor, delhi news, India news, Indian express, Indian express India news, Indian express IndiaThe DMRC said it completed a tunnel between Chhatarpur and Chhatarpur Mandir stations on Tughlakabad-Aerocity corridor. (Praveen Khanna)

A 865-metre tunnel between Chhatarpur and Chhatarpur Mandir stations on Delhi Metro’s under-construction Tughlakabad-Aerocity corridor was completed Wednesday.

Delhi Lieutenant Governor Vinai Kumar Saxena and Delhi Transport Minister Kailash Gahlot were present at the site of the breakthrough of the 97-metre-long tunnel boring (TBM) machine, used for tunnelling work.

According to the Delhi Metro Rail Corporation, two parallel circular tunnels for up and down movement are being constructed on the stretch as part of the corridor. The work on the other parallel tunnel in this section will be completed by September, it stated. This new tunnel has been constructed at an average depth of around 15 metres.

The TBM had to cross below the existing Yellow Line viaduct without disrupting metro train operations on the Line, it said.

 

Stay updated with the latest - Click here to follow us on Instagram

Tags:
  • delhi metro Delhi Metro network Delhi Metro Rail Corporation DMRC delhi metro stations New Delhi
Edition
Install the Express App for
a better experience
Featured
Trending Topics
News
Multimedia
Follow Us
Bihar pollsShortest election in 15 years: Will RJD retain its 20% vote share, and BJP climb back?
X