Can India’s power system keep up with the explosion in data centres?
India's power system is changing with the growth of AI-powered data centres. By 2030, the country's data centre capacity will reach 8-10 GW, creating challenges for grid planning and operations. Addressing the unpredictable nature of AI and ensuring resource adequacy, along with integrating renewable energy and energy storage, is crucial for affordable and sustainable power for these data centres.