This is an archive article published on December 16, 2021
Premium

James Webb Space Telescope: First 30 minutes after launch very crucial, says NASA engineer

The solar array is made up of five panels that are folded up and stowed in the launch vehicle. Their deployment is one of the most critical steps.

Solar Array Deployment TestSolar Array Deployment Test of the James Webb Space Telescope (Northrop Grumman)
Written by: Aswathi Pacha
4 min readKochiDec 16, 2021 07:41 PM IST First published on: Dec 16, 2021 at 07:41 PM IST

NASA announced Wednesday that the launch of its new space telescope has been delayed for at least two days as there was a communication problem between the observatory and the rocket. The liftoff of the James Webb Space Telescope is now scheduled for no earlier than December 24.

In an interview with indianexpress.com, Anisa Jamil, Electrical Power Systems Engineer – NASA Goddard Space Flight Center, explains how NASA’s largest telescope is powered.

Advertisement

What is the powerhouse of the James Webb Space Telescope?

The mission carries a battery and a six-metre solar array. The battery used is Lithium-ion and a little bigger than our car batteries.

Latest Comment
Post Comment
Read Comments