This is an archive article published on February 10, 2023
Premium

India’s green hydrogen challenge

The fuel has the potential to maximise decarbonisation of the energy sector and use of energy in sectors such as transport, buildings and industry. To realise the targets it has set, India needs to work with multiple institutional bodies

It has been estimated that the production of one kg of hydrogen by electrolysis requires around nine litres of water. Moreover, in the case of India, an independent assessment suggests a requirement of approximately 50 billion litres of demineralised water supply. (Illustration: C R Sasikumar)It has been estimated that the production of one kg of hydrogen by electrolysis requires around nine litres of water. Moreover, in the case of India, an independent assessment suggests a requirement of approximately 50 billion litres of demineralised water supply. (Illustration: C R Sasikumar)
7 min readFeb 10, 2023 09:31 AM IST First published on: Feb 10, 2023 at 07:01 AM IST

On India’s 75th Independence Day, Prime Minister Narendra Modi announced the National Hydrogen Mission to make the country a production and export hub of green hydrogen.

This mission was approved by the Union Cabinet on January 4, 2023 with an initial outlay of Rs 19,744 crore ($2.3 billion) over the next five years, aimed at producing 5 MMT (million metric tonne) per annum with an associated renewable energy capacity addition of about 125 GW (giga watt) by 2030.

Latest Comment
Post Comment
Read Comments