Premium

Zojila tunnel breakthrough: Why digging through the Himalayas is an engineering challenge

The breakthrough highlights the geological, climatic and engineering challenges of boring through one of the world's youngest and most unstable mountain ranges. We explain.

ZojilaA view of the Zojila Tunnel on June 9, 2026. Photo: Express
Written by: Sabah Virani
5 min readSonamargJun 11, 2026 09:44 AM IST First published on: Jun 10, 2026 at 06:09 PM IST

The breakthrough of the Zojila Tunnel, a 13-km passage being carved through the Himalayas at an altitude of over 11,500 feet, is a major milestone for one of India’s most challenging infrastructure projects. But unlike tunnels bored through relatively stable rock formations elsewhere, excavation in the Himalayas comes with a unique set of geological and environmental risks.

We explain why tunnelling through the Himalayas is particularly difficult, and how engineers navigated these challenges while excavating the Zojila Tunnel.

Sabah Virani is a journalist with The Indian Express’ Mumbai bureau, covering infrastructure, housin... Read More

Latest Comment
Post Comment
Read Comments