Premium

Tunnel hoods in Mumbai-Ahmedabad bullet train project: What they are, why they matter

These cylindrical-shaped structures are built at the entrance and exit of the main tunnel and have pressure-relief vents or windows. It is a common feature on high-speed rail systems in countries operating bullet trains.

tunnel hoodTunnel hoods are common on high-speed rail systems in countries operating bullet trains, where trains travel at speeds exceeding 300 km per hour. Photo: Express
Written by: Dheeraj Mishra
5 min readNew DelhiJun 15, 2026 06:52 PM IST First published on: Jun 15, 2026 at 06:52 PM IST

The tunnels in the Mumbai-Ahmedabad High Speed Rail (MAHSR), India’s first bullet train project, are entering the next phase of construction after the critical breakthroughs, where it will incorporate a unique feature being introduced for the first time in Indian Railways: tunnel hoods.

The 508-km project has seven mountain tunnels in Maharashtra and one mountain tunnel in Gujarat. Each tunnel will have tunnel hoods or entrance hoods at both ends. The entrance hood — meaning the entrance — in Gujarat’s only tunnel in Valsad has taken shape and is nearing completion.

Advertisement

“This is the first time such tunnel hood technology has been designed and implemented for railway tunnels in India. It has been designed to mitigate the tunnel boom effect caused by pressure waves generated by high-speed trains,” said the National High Speed Rail Corporation Limited (NHSRCL), the project’s implementing agency.

Dheeraj Mishra is a Principal Correspondent with the Business... Read More

Latest Comment
Post Comment
Read Comments