Premium

Kalpakkam fast breeder reactor attains criticality: why this is a ‘defining step’ in India’s 3-stage n-programme

Once commissioned, India will be second country after Russia to have a commercial operating FBR

kalpakkam nuclear reactorThe FBR is clearly being seen as an important milestone for getting to the third stage, clearing the way for the eventual full utilisation of the country's thorium. (PIB)
Written by: Anil Sasi
8 min readNew DelhiApr 8, 2026 05:11 PM IST First published on: Apr 7, 2026 at 11:02 AM IST

India is one of the few countries in the world with a long experience of developing nuclear technologies, including the generation of nuclear power. This includes a mastery over the pressurised heavy water reactor (PHWR) technology, or reactors that use natural uranium as fuel and heavy water (deuterium oxide) as coolant and moderator. These reactors now comprise the bulk of India’s installed atomic power capacity of 8,180 MWe (megawatt electric), alongside some imported light water reactors (LWRs) units.

Two other technologies are a work-in-progress: atomic reactors called fast breeders and a longstanding project that aims at eventually fabricating thorium-based nuclear reactors. These three technologies (PHWRs-FBRs-Thorium reactors), progressing in series, make up India’s ambitious three-stage nuclear power programme. This programme envisages a pathway to utilising India’s abundant thorium reserves – found in coastal and inland placer sands on the beaches of Kerala, Tamil Nadu, Odisha, Andhra Pradesh, Maharashtra and Gujarat, and in the inland riverine sands of Jharkhand and West Bengal – to generate electricity.

Anil Sasi i... Read More

Latest Comment
Post Comment
Read Comments