Chalo PMC, a citizen-led movement for civic issue resolutions had raised objection to the removal and replantation of trees obstructing road widening near Sadhu Vaswani bridge and Ramtekdi flyover bridge. After a hearing in January and a recent site visit for these projects with the officials, a final hearing was scheduled on February 13. As no output came out of the meeting, the group of citizens expressed lack of trust in the PMC citing miscommunication and incomplete implementation of projects.
The meeting was presided over by assistant commissioner, Indrayani Karache and Assistant garden superintendent, Guruswami Tummale. As the meeting progressed, a can of worms opened up when citizens cited all the incidents of tree felling in the city over the years. As the ward officer, Indrayani Karache requested to focus on the matter at hand about the Sadhu Vaswani Bridge, a citizen pointed to look at the cumulative effect of a sequence of such projects. Demanding accountability, the citizens questioned if compensatory trees were planted for the tree felling that has happened in the last four months.
The authorities present in the meeting got the road department on call and it was accepted that they did not plant 2265 compensatory trees for the tree felling that happened on North Main Road in December 2023, even as the due date for the same has passed. As the immediate step of action, citizens signed a letter demanding strict action against concerned authorities. The letter said, “These officials are defaming and causing mistrust amongst citizens against PMC hence we demand swift and decisive action. It’s imperative to restore confidence through stringent measures”.
While showing a video of barren land Vickrant Singh pointed, “The trees planted under meri maati, mera desh on Taljai hills have not been watered regularly. One tanker is used to water trees in three wards. I have myself watered these plants in absence of proper implementation by PMC”.
Talking about the concerns regarding the Sadhu Vaswani Bridge project, citizen Rupesh Ramkesekar said, “PMC standing committee had passed a resolution regarding the bridge. It contained an order to create a plan about the overall traffic system of the area near the bridge to determine whether the bridge needs to be widened. The ward officer had requested the road department in the previous meeting to give the plan for today’s meeting. But it was not presented. Secondly, for the Kalyani nagar to Koregaon park bridge, the project department had.
Officials in the meeting highlighted that the condition of the bridge is weak and a traffic study showed a requirement of four lanes. “All the objections and suggestions have been taken into consideration and will forward it to the higher officials and ensure compliance ”, said Karache.