This is an archive article published on August 18, 2020
Premium

Baghjan blowout: First phase of final ops to cap oilfield successful

The OIL statement added that data collection at the site has been completed for the Environmental Impact Assessment (EIA) study by various agencies.

assam gas leak, assam blowout, Baghjan gas well, assam gas leak news, Baghjan tragedy assam Tinsukia, Oil India Limited (OIL), assam news, latest newsThe OIL statement added that data collection at the site has been completed for the Environmental Impact Assessment (EIA).(Source: Indian Oil Limited)
Written by: Abhishek Saha
2 min readGuwahatiAug 18, 2020 12:00 PM IST First published on: Aug 18, 2020 at 12:00 PM IST

The first phase of the final operation to plug well number 5 at Oil India Limited (OIL)’s Baghjan oilfield in Assam’s Tinsukia district — where a blowout occurred in May — was successful on Monday after two failed attempts earlier.

OIL said in a statement that the Blowout Preventer (BOP) — a device essential to plug the leak — was successfully placed over the well head. “The 16 studs have also been tightened. The preparations for killing operations are on. The BOP and the lines connected to it are being kept cool through continuous spraying of water,” OIL said in a statement.

Advertisement

OIL officials confirm that the next stage of operations — which is “killing the well” or shutting it down completely — will follow.

Latest Comment
Post Comment
Read Comments