Amid row over Master Plan amendments, experts panel suggested: ‘No changes to FAR until infrastructure is upgraded’

The committee directed that the recommendations should not be implemented until the infrastructure upgrades are actually carried out.

chandigarh masterplanThe bureaucratic panel itself clearly specified that the “recommendation shall be kept in abeyance till infrastructure augmentation of the components as mentioned above is not executed”. (Source: File)
Written by: Hina Rohatki
5 min readChandigarhJun 24, 2026 01:44 PM IST First published on: Jun 24, 2026 at 01:44 PM IST

At the heart of the controversy surrounding Chandigarh’s proposed Master Plan amendments lies a striking contradiction in the expert committee report itself. While recommending a substantial increase in the floor area ratio (FAR) for the industrial belt, ground coverage and building heights in industrial areas, a panel of UT officers simultaneously acknowledged that existing infrastructure would require major augmentation before the changes could be implemented, details accessed by The Indian Express suggested.

Documents showed that the committee, headed by the Deputy Commissioner-cum-Estate Officer and comprising officials from the Municipal Corporation, Engineering Department, Urban Planning Department, Chandigarh Housing Board and other government departments, recommended relaxations in building norms for industrial and commercial areas. The committee was tasked by the Administrator with examining measures to reduce what it termed “land loss” and increase development potential.

Latest Comment
Post Comment
Read Comments