Premium

‘Little to do with Bengaluru traffic’: Residents oppose Old Madras Road-Silk Board Jn flyover

Bengaluru Smart Infrastructure Limited (B-SMILE) has invited tenders to construct the flyover at a cost of Rs 1,300 crore.

Bengaluru flyover project Ejipura flyover BengaluruAccording to B-SMILE, this elevated corridor will complement the under-construction Ejipura flyover. (File Photo)
Written by: Kiran Parashar
4 min readBengaluruJun 10, 2026 03:22 PM IST First published on: Jun 10, 2026 at 03:20 PM IST

Bengaluru residents have opposed the civic authorities’ plan to build an 11.62-km flyover linking the SV Road metro station on Old Madras Road to Silk Board Junction on Hosur Road, arguing that the project’s cost would far outweigh its benefits. There are several incomplete flyovers in the city.

Bengaluru Smart Infrastructure Limited (B-SMILE) has invited tenders to construct the flyover at a cost of Rs 1,300 crore. The elevated corridor will pass through Indiranagar’s 80 Feet Road, CMH Road, and 100 Feet Road before stretching towards Madiwala.

Advertisement

I Change Indiranagar, a federation of resident welfare associations in Indiranagar, has written a letter to the managing director of B-SMILE requesting a public consultation.

Latest Comment
Post Comment
Read Comments