This is an archive article published on July 27, 2025
Premium

Gujarat Hardlook | Bumpy road to progress: Monsoon caused 21,480 potholes, 1500 kms of broken road; 133 bridges closed for repairs

Roads in Gujarat started breaking down as soon as the monsoon set in, early June. Then on July 9, a bridge collapsed, killing 21. At the peak of the season, over 1500km of roads were damaged and nearly 133 bridges were closed

GujaratIn Vadodara city, the closure of the Ranoli Railway Over Bridge on the outskirts of the city left the residents vexed about reaching their workplace (Express/Bhupendra Rana)
Written by: Aditi Raja, Ritu Sharma
13 min readAhmedabad/vadodaraJul 27, 2025 11:13 AM IST First published on: Jul 27, 2025 at 03:45 AM IST

Less than a month into the Southwest monsoon’s arrival in Gujarat, over 21,000 potholes have surfaced across the state’s roads, exposing their poor condition.

With diversions on account of slow moving traffic, and the precautionary closure of bridges over rivers following the July 9 Mujpur-Gambhira bridge collapse in Vadodara district, the busy Ahmedabad-Mumbai highway was recently hit by a jam that resulted in the traffic crawling for more than a day on a 15-km stretch on the outskirts of Vadodara.

Advertisement

The bridge collapse claimed 21 lives (one person’s remains were untraceable), and the subsequent 40-plus km detour has resulted in increased costs and travel time for commuters going towards Vadodara-Bharuch from the Anand side.

Aditi Raja is an Assistant Editor with The Indian Express Read More

Ritu Sharma is an Assistant Editor Read More

Latest Comment
Post Comment
Read Comments