Drones to inspect progress of mega rail projects

Besides, the public sector behemoth has also decided to use drones to assess the ground situation in the aftermath of train accidents.

By: PTI | New Delhi | Published:April 17, 2016 12:12 pm
indian railway, indian rail, indian railway drone, drone railway, irctc, mega rail projects, indian railways mega projects, indian railway use drone, flying robot, train, indian trains, book tickets, railway tickets, india news A drone is essentially a flying robot which can be remotely handled through software-controlled flight plans embedded in its systems working in conjunction with GPS.

Indian Railway has used drones for the first time for inspecting a mega rail project to assess the progress on the ground and the flying machine would now be used to monitor other under-construction schemes.

An unmanned aerial vehicle, also called drone, was used to inspect the ongoing work on the Dedicated Freight Corridor (DFC) project and, as per the plan, all ongoing projects will be monitored through aerial survey.

Besides, the public sector behemoth has also decided to use drones to assess the ground situation in the aftermath of train accidents.

Share This Article
Share
Related Article

A drone is essentially a flying robot which can be remotely handled through software-controlled flight plans embedded in its systems working in conjunction with GPS.

“We used a drone to ascertain the progress on the 42 km long track between Baghega to Srimadhopur in Rajasthan in the Western DFC and also the 56 km long line between Durgawati and Sasaram in Bihar,” DFC Managing Director Adesh Sharma said.

The drone was used for three days on a trial basis to cover the total 98 km on the DFC. The status report was prepared after the analysis of video recordings.

“It becomes easier and faster to prepare the status report of an ongoing project through drone. Field work can be monitored from the office using the drone footage,” said Sharma.

The drone was hired from a private operator and it cost Rs 3,000 per km for undertaking the aerial survey.

Currently about 170 projects, including doubling and laying of new lines, are being executed by railways.

Drones will now be used to assess actual physical progress of these projects, sources said.

As far as DFC is concerned, the Durgawati-Sasaram section is complete now and awaiting safety clearance before being commissioned.

Video of the day

For all the latest India News, download Indian Express App

    Live Cricket Scores & Results